Big Foot Technical worked in collaboration with the architect for the scheme to develop a solution for the required Safe Access system. This included the design, specification and quotation within the tender documentation.
Once the contract was awarded and access to site was possible, the Big Foot Site Engineer was able to accurately survey the site and also be present for the first day of assembly. The six items of modular Safe Access staircase, landings and ladders were all installed on-site within three days.