Big Foot Systems supplied extensive custom Safe Access support to maintain plant. This included four heat pumps and three dry air coolers, located on the flat roof of the research building.
The Big Foot site engineer visited to measure the 21 platforms that were required on the rooftop; the technical team were then able to design a custom solution for each location. After months of collaboration with the Planning Office and Leniger the installation engineering team, works began on the roof of the research building. Due to the small roof area, the installation was split into two phases with separate deliveries and crane lifts.